SRI ® EPC Contract << Back

We at Shri Ram Group Of Industries offer the entire range of EPC services covering design, engineering, supply, construction, testing and commissioning of MV and EHV infrastructure. We undertake projects for DISCOMs, Industries, Franchisees, Railways and other big Corporate houses all over India. The scope of Distribution Systems work broadly involves SITC works of 33 kV and 11 kV Substations, Distribution Lines, Distribution Transformers, Power transformer, Metering, Line lay-out covered under various schemes such as Rural and Urban Electrification, RGGVVY, APDRP.

  • Services Offered
  • List Of Project Work

Our capability:

GIS Survey, Asset Mapping & Analysis and Consumer Indexing.
Turnkey EPC for Power Distribution Network establishment
Network Optimization and EPC of Feeder Separation
Franchising and UG cabling
Operation & Maintenance
Unmanned Substations and SCADA Implementation

We have a vast experience in the power sector and whole gamut of Power Distribution and Transmission products in our product portfolio. This enables us to undertake and complete EPC contracts within quickest time frame and of the highest quality standards.

List of Project Work Executed/Under Execution 2015-16

Sr. No. Name of Contract Employer’s Address Position
01. Design, Manufacturing, supply erection, testing& commissioning for construction of 33/11KV 3.15MVA Transformer sub-station withcapacitor bank & installation of additional 33KV bay (with VCB) and new 33KV & 11KV linesunder ST(N)-15 work in Ratlam & Dewas Circle. MPPKVVCL, Indore Completed
02. Package no. IND/WS/22, LOT No. 2, Construction of 33KV Double circuit transmission Line on Rail pole Between 132 KV substation at Chhoti Khargon (IMC) & Bhakli(IMC) and Construction of 4 Nos. 33KV Bays /Including Materials. Commissioner, Muncipal Corporation, Indore Completed
03. External electrification work at R&R village Malgaon SE (Civil) Member Executive Committee MHEP, Mandeleshwar Completed
04. Turnkey work Supply & Erection Portion Indore & Ujjain Region Under system Strengthening (SSTD) schem PKG – 696 P.O. No. MD/WZ/06/WORKS /SSTD/PKG- 696/ORD-11/12812 & ORD-12/12813 Dtd. 10.06.2013 Project Director / SE (Works) O/o MD (WZ), MPPKVVCL, Indore Completed
05. Supply of Material, Survey, Erection, Installation, Testing & commissioning of permanent 100 KVA Distribution Transformers in place of Temporary Rental Distribution Transformer and Associated 11KV Line & LT Line on AB cable in Indore Region on Turnkey Basis. Project Director MPPKVVCL Indore LOA No.MD/WZ/06/PUR/ADB/PPR-42/Lot-1/24637 DT.10.12.2013 Completed
06. Supply of Material survey, Erection, Installation, Testing & Commissioning of permanent 100KVA Distribution Transformers in place of Temporary Rental Distribution Transformer and Associated 11KV Line & LT Line on AB cable in Ujjain Region on Turnkey Basis. Project Director (SPL with JV MITPL) MPPKVVCL Indore LOA No.MD/WZ/06/PUR/ADB/ PPR-42/Lot-2/24638 dt.10.12.2013 Completed
07. Supply & Construction of new 33/11 KV S/s and Associated 33 KV and 11 KV lines including bays at 33/11 KV S/s, DP structures, road/river crossings and 1500 KVAR Auto-Switched Capacitor Bank etc. on turnkey basis in Indore Region (No of location 14) under system strengthening (SSTD) scheme. The Project Director (SSTD) MPPKVVCL Indore P.O.No.MD/WZ/06/Works/SSTD PKG-788/ORD-25/18919 dt.03.11.2014 Under Execution
08. Supply & Construction of new 33/11 KV S/s and Associated 33 KV and 11 KV lines including bays at 33/11 KV S/s, DP structures, road/river crossings and 1500 KVAR Auto-Switched Capacitor Bank etc. on turnkey basis in Indore Region (No of location 14) under system strengthening (SSTD) scheme. The Project Director (SSTD) MPPKVVCL Indore P.O.No.MD/WZ/06/Works/SSTD PKG-788/ORD-26/18920 dt.03.11.2014 Under Execution
09. Supply & Construction of new 33/11 KV S/s and Associated 33 KV and 11 KV lines including bays at 33/11 KV S/s, DP structures, road/river crossings and 1500 KVAR Auto-Switched Capacitor Bank etc. on turnkey basis in Indore Region (No of location 14) under system strengthening (SSTD) scheme. The Project Director (SSTD) MPPKVVCL Indore P.O.No.MD/WZ/06/Works/SSTD PKG-788/ORD-27/18921 dt.03.11.2014 Under Execution
10. Supply & Construction of new 33/11 KV S/s and Associated 33 KV and 11 KV lines including bays at 33/11 KV S/s, DP structures, road/river crossings and 1500 KVAR Auto-Switched Capacitor Bank etc. on turnkey basis in Indore Region (No of location 14) under system strengthening (SSTD) scheme. The Project Director (SSTD) MPPKVVCL Indore P.O.No.MD/WZ/06/Works/SSTD PKG-789/ORD-28/18922 dt.03.11.2014 Under Execution
11. Supply & Installation of permanent 100 KVA 11/0.43 KV Distribution Transformers in place of temporary rental Distribution Transformers along with associated 11 KV line on Rabbit conductor and LT line on AB cable on turnkey basis in all Circles of Indore Regions (No. of locations 295) under system strengthening (SSTD) scheme. The Project Director (SSTD) MPPKVVCL Indore P.O.No.MD/WZ/06/Works/SSTD PKG-791/ORD-31/18925 dt.03.11.2014 Under Execution
12. Supply & Installation of permanent 100 KVA 11/0.43 KV Distribution Transformers in place of temporary rental Distribution Transformers along with associated 11 KV line on Rabbit conductor and LT line on AB cable on turnkey basis in all Circles of Indore Regions (No. of locations 295) under system strengthening (SSTD) scheme. The Project Director (SSTD) MPPKVVCL Indore P.O.No.MD/WZ/06/Works/SSTD PKG-791/ORD-32/18926 dt.03.11.2014 Under Execution
13. Supply & Installation of permanent 100 KVA 11/0.43 KV Distribution Transformers in place of temporary rental Distribution Transformers along with associated 11 KV line on Rabbit conductor and LT line on AB cable on turnkey basis in all Circles of Indore Regions (No. of locations 659) under system strengthening (SSTD) scheme. The Project Director (SSTD) MPPKVVCL Indore P.O.No.MD/WZ/06/Works/SSTD PKG-792/ORD-33/18927 dt.03.11.2014 Under Execution
14. Supply & Installation of permanent 100 KVA 11/0.43 KV Distribution Transformers in place of temporary rental Distribution Transformers along with associated 11 KV line on Rabbit conductor and LT line on AB cable on turnkey basis in all Circles of Indore Regions (No. of locations 659) under system strengthening (SSTD) scheme. The Project Director (SSTD) MPPKVVCL Indore P.O.No.MD/WZ/06/Works/SSTD PKG-792/ORD-34/18928 dt.03.11.2014 Under Execution
15. SITC of 5 MVA 33/11 kV Power Transformer at Chatri Chowk, Ujjain, M.P ESSEL Group, Ujjain Franchise, Ujjain, M.P. Completed